The team of installation guidance engineers dispatched by Liding Environmental Protection have rich industry experience and professional knowledge, are proficient in the installation, commissioning and maintenance of sewage treatment equipment, and have excellent ability to deal with various complex environments and construction conditions. After arriving in the local area, the engineer team quickly carried out in-depth communication with the relevant departments of the local government and organized a project workshop.
At the meeting, the engineers introduced in detail the technical principles, performance advantages and successful application cases of Liding environmental protection SA3 ton sewage treatment equipment. The equipment adopts the improved AO/AAO process, has efficient pollutant removal ability, can adapt to the needs of domestic sewage and industrial wastewater treatment with different water quality, and occupies a small area, low energy consumption, and is suitable for operation under the conditions of limited local land resources and energy supply.
In view of the local geographical environment, population distribution and existing sewage drainage system, the engineers proposed a set of scientific and reasonable layout and planning schemes. Ensure that every sewage can be effectively treated.
Post time: Jun-26-2025